Co-ordination of telecommunications close-out programme.
Client: Marconi Communications
Leewood Projects has been working with the Beeston & Chilwell for Integrated Transport group on Phase 2 of the successful Nottingham Express Transit [NET] system for four years, providing advice, information & comparative data on UK and European Light Rail systems and is appraising route proposals for Phase 3, to extend the system to:
http://richardsrobinson.org.uk/?p=283
are very dependent on the approval of the proposed NET Phase 2 extension to Beeston, Chilwell, Clifton & Willford.
Lower Faser Valley, Chiiliwack to Surrey BC, Interurban Tram-Train…
Valley light rail all go, twin groups claim Vancouver Province
More ammo for light rail service through Valley
Chilliwack Progress
Valley residents on track with light rail
Vancouver Sun
Between 2002 and 2004, Leewood Projects carried a feasibility study & appraisal for a Light Rapid Transit scheme for the Kingston upon Thames area (K-SMART).
k-smart-performance-specification-feb04
Client: Royal Borough of Kingston [RBK], Kingston Chamber of Commerce and Transport for London
Links to Feasibility study sponsors:
The redevelopment of St Pancras station, is the incredible £800 million architectural restoration and extension of a unique London landmark. When the station first opened in 1868 William Barlow’s train shed was a spectacular feat of Victorian engineering and held the world record for the largest enclosed space for many years.
Design works commenced in 1999 and construction in 2000 of the redevelopment for King’s Cross St Pancras Underground Station, one of the busiest stations on London’s underground system.The redevelopment includes the enlargement and refurbishment of the existing Tube Ticket Hall, a new Western Ticket Hall under the forecourt of St Pancras and a new Northern Ticket
King’s Cross St Pancras serves the Metropolitan and Circle underground lines at sub-surface level and the Northern, Victoria and Piccadilly Lines at deep level. The underground station also acts as an interchange for St Pancras and King’s Cross National & International rail service
Leewood Projects have been actively involved with the King’s Cross St.Pancras Redevelopment Project since 2001:
Since 2001, Leewood Projects has managed:
Without incident.
Brought into LUL operations, Phase 1 Western Ticket Hall in May 2006, completed the Phase 2 NLA & PLA tunnels in April 2008. The Northern Ticket Hall was opened on November 29th 2009.
Civil Engineering
Branch of engineering that is concerned with the construction of railways, bridges, stations, tunnels, canals, irrigation works, harbours and other large facilities.
Project Management
The systematic planning, organising and controlling of allocated resources to accomplish project cost, time and quality. Phase 1 of the high speed Channel Tunnel Rail Link Project [CTRL], 1999 - 2001
Construction Management
Ensuring that the various stages of the construction process are completed in a safe, timely and seamless fashion, from submission of the Construction phase health & safety plan to completion of the construction and the commissioning & handover of the facility to the client. Croydon Tramlink, 1997 - 1999
Prequalification & Contract Planning
To formulate a scheme or program for the accomplishment, enactment, or attainment of the completed construction process. Earl’s Court Station Refurbishment Project
Management of rail project works from start-to-finish; - including planning and preparation of possession plans… through to execution of works and management of the hand-back.
[CTRL] LUL King’s Cross St.Pancras Redevelopment Project, 2001 - present
Stakeholder & Interface Management
A surface forming a common boundary between adjacent regions, bodies, substances, or phases. [CTRL] LUL King’s Cross St.Pancras Redevelopment Project, 2001 - present
Transport Project Appraisal & Planning
Kingston area Rapid Transit Scheme (K-SMART), 2002 - 2004
Nottingham Express Transit [NET] Phase. 3, 2008
Risk Assessment
Programme Management
LUL – Transition to Shadow Running phase of PPP, 2000
Integration Engineering
A systematic arrangement of elements or important parts; a configuration or outline.
Project Connect - LUL, TETRA standard digital radio system, 2000
Value Engineering
A process directed at appraising a project for the purpose of achieving the required function at the lowest total cost of effective ownership, consistent with requirements for performance, reliability, quality, and maintainability. West London Transit, 2004
Acceptance & Commissioning Management
Opened in May 2000, Croydon Tramlink carry’s over 25 million passengers a year over a 28km (18.5 mile) modern tramway system covering South London, UK. The line is largely on an east-west axis through a central loop around Croydon and provides very useful, environmentally friendly, modern public transport. Tramlink has contributed to a 25% transport Modal Shift in South London. LINK.
Leewood Projects – Contract programme & system acceptance programme management, construction management – track, OHLE & communications systems.
Client - Amey/McAlpine CJV
Latest Project Updates
LEEWOOD PROJECTS LIMITED
David and Kate Cockle - Directors
38 Deacon Road
Kingston upon Thames
Surrey
KT2 6LU
United Kingdom
Phone : +44 (0)20 8541 0715
Fax : +44 (0)20 8546 4260
E-mail : info@leewoodprojects.co.uk